Construction · HS2 Phase One
HS2
Hotel-quality en-suite rooms beside operations since 2021, plus a two-storey wellbeing centre and gym.
4
en-suites per 45ft module
Case studies
Construction · HS2 Phase One
Hotel-quality en-suite rooms beside operations since 2021, plus a two-storey wellbeing centre and gym.
4
en-suites per 45ft module
Energy · Premier Oil
Planning secured with Port Stanley, then an 80-room village shipped from the UK, with dining, gym and lounge.
8,000
miles from the UK
Leisure · Surrey
One of the first modular hotels inside a major UK theme park, enabling overnight break packages.
1st
modular hotel in a major UK park
Energy · Catering
A full canteen and grab-and-go vending service, delivered alongside accommodation.
300
staff fed every day